The area around taxiways D,B and T to the south have changed in the real world , e.g. new taxiway Z added ..T extended..apron extended to the south ... do you plan on updating this at some point?

Thanks

Rich

Share this post


Link to post
Share on other sites

Hello, I'm not a dev but I work at the real airport.

There is quite a huge WIP ongoing at the moment; last summer they repaved the 18/36 rwy and installed new LED lights (aprons + taxiway/rwy lts), there is a new white facade landside.. A portion of the old terminal has been demolished, and a new one is being built. A temporary terminal has been placed in front of jetways 4 and 5 (jetways 4 and 5 have been removed actually). Originally, the plans (pre-covid) were to end this first renew phase in 2021.
http://www.milanotoday.it/foto/cultura/linate-aeroporto-foto/#nuovo-aeroporto.html

But along came the lockdown, at the moment Linate airport is still closed with all flights being routed to Malpensa, no ETA for a reopening (some talk about March 2021)...while construction works started again in April/May.

After the 1st phase, the whole project masterplan spans into 2030 with a lot of changes, like moving the iconic Emporio Armani hangar elsewhere to make room for the new terminal and apron. If you want to have a general view at Linate 2030 masterplan head here:
http://www.mxpairport.it/forum/viewtopic.php?t=11306&start=125

All this to say, in the next months you will be probably see many other layout changes, but I'm not sure the developers can make every single one...
Personally I'd be happy to see the repaved rwy, the new LED lightning effects, the new white landside and the temporary new terminal (with the F block demolished :P)

But just having it on P3D v5 would be awesome!

Share this post


Link to post
Share on other sites

Hello Stefano,

Thank you for this very useful information about the current works at Linate. We are currently bringing LIML to P3Dv5 (new installer to be uploaded today). We can consider doing an update in 2021 if works are in an advanced stage. Doing "small steps" updates is always very time consuming and a bit tricky as works continue and the update will be valid for a few weeks at most, compared to the works at the real airport.

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...

×
×
  • Create New...